Walkthrough4 minute read
Teams and divisions workspace walkthrough
See how to move from team entry to divisions without creating extra tidy-up work later.
On this page
What this page is for
The teams workspace is where you check the event structure still makes sense before fixtures exist.
Main areas on this page
- Team list
- Use this area to review names, clubs, and formats before anything is scheduled.
- Division builder
- Split teams into the right groups or brackets once the team list is clean.
- Final review
- Do one pass for missing teams, duplicates, and obvious placement mistakes.
Typical flow
- 1
Review team names and clubs first.
- 2
Build the divisions second.
- 3
Do a final count check before scheduling.
Important checks
- Every expected team is present.
- The number of teams in each division looks sensible.
- No team is sitting in the wrong age group or format.
Common questions
Should I schedule before divisions are final?
No. Fixtures are much easier to trust when the team structure is final first.
When should I remove a withdrawn team?
As soon as you know. Do not leave withdrawn teams in place while building divisions.